ABB i-bus EIB Product Manual page 124

Application unit time, intelligent installation systems
Hide thumbs Also See for i-bus EIB:
Table of Contents

Advertisement

®
ABB i-bus
EIB / KNX
© 2006 ABB STOTZ-KONTAKT GmbH
Commissioning
The Group parameter window is activated in the following way:
- by double-clicking on *** new group *** or
- by pressing the right mouse button and selecting New group in the pop-up
menu or
- by selecting Edit in the menu bar and then activating New group in the
pop-up menu.
Fig. 131:
Parameter window: "Group""
No.
The group number (QU No.) is automatically allocated by the application
program Times Groups/2 and is a consecutive number for the unique
identification of the group.
Name
The group name (QU Name) can be freely selected and can e.g. describe
which functions are activated by this functional group or which part of the
building is affected by the triggering of the group. A maximum of 50
characters are available.
124

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-bus abz/s 2.1I-bus knx

Table of Contents