Special days - General

© 2006 ABB STOTZ-KONTAKT GmbH
Commissioning
Fig. 117:
Dialog window: "Special days - General"
Special days are days on which the standard week routine and the
associated day routine should not be carried out. Special days on which a
specific day routine is executed can be defined for both one day (e.g. Bank
Holiday) and several days (e.g. holidays).