Edit Special Day - ABB i-bus EIB Product Manual

Application unit time, intelligent installation systems
Hide thumbs Also See for i-bus EIB:
Table of Contents

Advertisement

®
ABB i-bus
EIB / KNX
3.4.7.2

Edit special day

© 2006 ABB STOTZ-KONTAKT GmbH
Commissioning
Fig. 121:
Dialog window: "Edit special day"
To edit a special day, first select Time switch program in the selection area
followed by Special days, e.g. from Th. 11.05.2006, 08:00 o'clock.
The associated table is activated in the right-hand window.
The table is divided into Start, End and Day routine.
The meaning of the individual columns is as follows:
Start
The start of the special day is displayed in this column.
End
The end of the special day is displayed in this column.
Day routine
This column displays the day routine.
113

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-bus abz/s 2.1I-bus knx

Table of Contents