Figure 148: Switchyard layout double circuit breaker
For a double circuit-breaker bay, the modules DB_BUS_A, DB_LINE and DB_BUS_B must be
used.
13.4.8.2

Configuration setting

For application without QB9 and QC9, just set the appropriate inputs to open state and
disregard the outputs. In the functional block diagram, 0 and 1 are designated 0=FALSE and
1=TRUE:
QB9_OP = 1
QB9_CL = 0
QC9_OP = 1
QC9_CL = 0
If, in this case, line voltage supervision is added, then rather than setting QB9 to open state,
specify the state of the voltage supervision:
QB9_OP = VOLT_OFF
QB9_CL = VOLT_ON
If there is no voltage supervision, then set the corresponding inputs as follows:
VOLT_OFF = 1
VOLT_ON = 0
13.4.9

Interlocking for 1 1/2 CB BH

Application manual
QB1
QC1
QA1
QC2
QB61
QB9
QC9
WA1 (A)
WA2 (B)
QB2
QC4
QA2
DB_BUS_B
QC5
QB62
QC3
DB_LINE
en04000518.vsd
Section 13
Control
M13584-4 v4
M13584-6 v5
IP14173-1 v3
295

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents