For Initial Start-Up, Follow Steps 1 Through 4 Below; Make First Start Assistant-Guided Settings: Language, Motor Nominal Values, And Date And Time - ABB ACH580 Series Installation, Operation And Maintenance Manual

Hide thumbs Also See for ACH580 Series:
Table of Contents

Advertisement

ACH580 Installation, Operation and Maintenance Manual

For initial start-up, follow steps 1 through 4 below.

WARNING! Do not start up the drive unless you are a qualified electrical
professional.
Read and obey the instructions in chapter Safety instructions at the beginning of the
manual. Ignoring the instructions can cause physical injury or death, or damage to
the equipment.
WARNING! Verify there is no active start command on drive terminal DI1 on power
up, as this is default run command.
Check that the starting of the motor does not cause any danger.
De-couple the driven machine if
• there is a risk of damage in case of an incorrect direction of rotation, or
• a Normal ID run is required during the drive start-up, when the load torque is
higher than 20% or the machinery is not able to withstand the nominal torque
transient during the ID run.
Note: For additional E-Clipse bypass primary settings information please go to
page 111.
1. Make First start assistant-guided settings: Language, motor nominal values, and
date and time
1
2
3
Have the motor name plate data at hand.
Power up the drive.
The First start assistant guides you through the first
start-up.
The assistant begins automatically. Wait until the control
panel enters the view shown on the right.
English is pre-loaded. To change the control panel, select
the language you want to use by highlighting it and
pressing
(OK).
Note: After you have selected the language, it takes a
few minutes to download the language file to the control
panel.
Select Commission the ACH580 and press
(Next).
ACH580-01 Installation
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents