3.8 Verify Installation

During equipment installation, you must verify the installation each time you power on
the Eudemon200 firewall, making sure that
Enough clearance has reserved around the Eudemon200 firewall for adequate
dissipation and the cabinet is stable enough.
The correct power supply is used.
The connection of the PGND wire of the Eudemon200 firewall is correct and
secure.
The connections with other devices, such as the console terminal, are correct.
Note:
It is very important for you to check the equipment installation, as the secure connection, well grounding,
and use of the correct power supply are essential to the normal operation of the Eudemon200.