This chapter contains a list for checking the mechanical and electrical installation
and the start-up procedure of the drive.

Checklist

Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person. Read the
instructions
Check that ...
MECHANICAL INSTALLATION
The ambient operating conditions are allowed. See
data,
Ambient
conditions.
The unit is fixed properly on floor and a vertical non-flammable wall. See
The cooling air will flow freely.
ELECTRICAL INSTALLATION See
The motor and the driven equipment are ready for start. See
and compatibility, Technical
The +E202 EMC filter capacitors are disconnected if the drive is connected to an IT (ungrounded) system.
The capacitors are reformed if stored over one year, refer to ACS 600/800 Capacitor Reforming Guide [64059629
(English)].
The drive is grounded properly.
The mains (input power) voltage matches the drive nominal input voltage.
The mains (input power) connections at L1, L2 and L3 and their tightening torques are OK. See
Cable
entries.
Appropriate mains (input power) fuses and disconnector are installed.
The motor connections at U2, V2 and W2 and their tightening torques are OK. See
entries.
The motor cable is routed away from other cables.
Voltage setting of the cooling fan transformer
Setting of the auxiliary voltage transformer T10 (if present). For location, see
Voltage setting of the IP54 fan transformer T15 (if present). For location, see
Voltage setting of the brake resistor fan transformer (if present).
There are no power factor compensation capacitors in the motor cable.
on the first pages of this manual before you work on the unit.
Mechanical installation, Technical
Planning the electrical installation, Electrical installation.
data:
Motor
connection.
data:
Mechanical installation.
Planning the electrical installation: Motor selection
Technical data
Maintenance
Maintenance
Installation checklist and start-up
Safety
IEC data
or
NEMA
Technical data
/
/
Cable
/
Cabinet
layout.
/
Cabinet
layout.
85

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-07

Table of Contents