Fastening The Cabinet To The Floor And Roof/Wall (Marine Units) - ABB ACS800-U7 Hardware Manual

Acs800 45 to 560 kw; 50 to 600 hp
Hide thumbs Also See for ACS800-U7:
Table of Contents

Advertisement

Fastening the cabinet to the floor and roof/wall (marine units)

See ACS800-07/U7 Dimensional Drawings [3AFE64775421 (English)] for the
locations of the fastening holes in the flat bars below the cabinet and for fastening
points at the top of the cabinet. Top fastening brackets are included in the delivery.
Fasten the cabinet to the floor and roof (wall) as follows:
1. Bolt the unit to the floor through the holes in each flat bar at the base of the
cabinet using M10 or M12 screws.
2. If there is not enough room behind the cabinet for installation, clamp the rear ends
of the flat bars.
3. Remove the lifting lugs and bolt the fastening brackets into the lifting lug holes (a).
Fasten the top of the cabinet to the rear wall and/or roof with brackets (b).
3a
3a
1
IP54 roof
3a
1
1
3b
Fastening bracket
M16 bolt
3a
Cabinet
Fastening the cabinet at the top with brackets (side view)
2
Back panel of
cabinet
Clamps
Clamping the cabinet to the floor at the back
Fastening bracket
Flat bars at base of cabinet
Mechanical installation
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-07

Table of Contents