Routing The Control/Signal Cables Inside The Cubicle; Units Without An Enclosure Extension - ABB ACS800 Hardware Manual

45 / 60 to 560 / 600 kw
Hide thumbs Also See for ACS800:
Table of Contents

Advertisement

Routing the control/signal cables inside the cubicle

Units without an enclosure extension

Secure the
cables with
cable ties to
the holes in
the side
bracket of the
capacitor
pack.
Lead the
cables through
the cushions.
This is for
mechanical
support only.
(No 360
degrees EMC
grounding is
needed here.)
Place for user's motor
temperature relay
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Frame size R7
Secure the
cables with
cable ties to
these holes.
Disconnect the
control panel cables.
Frame size R8
RMIO
Opening the
top front
cover (R7)
Place for user's motor
temperature relay
Installation
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-02Acs800-u2

Table of Contents