Installation Procedure; Choose The Mounting Orientation (A, B, C Or D); Mounting Orientations A And B - ABB ACS800 Hardware Manual

45 / 60 to 560 / 600 kw
Hide thumbs Also See for ACS800:
Table of Contents

Advertisement

Installation procedure

Choose the mounting orientation (a, b, c or d)

a)
Symbols:
Frame
Mounting
Required free space around the unit for mounting, maintenance, service and cooling *
size
orientation
R7
a, d
b
c
R8
a, d
b
c
* space for the installer not included
** space for fan and capacitor replacement not included

Mounting orientations a and b

Make holes in the wall (recommended):
1. Lift the unit against the wall into the mounting place.
2. Mark the locations for the two fixing points in the wall (not for mounting orientation a if the unit is
subjected to sideways vibration).
3. Mark the bottom edges of the unit to the floor.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
b)
Lifted from above
required free space
air inlet surface
wall fixing point (recommended)
control panel mounting slot
Front
mm
in.
500
20
-
-
-
-
600
24
-
-
-
-
c)
With enclosure extension
Note: The unit can also be installed away
from the wall.
Side
mm
in.
-
-
500
20
200**
7.9**
-
-
600
24
300**
12**
d)
Above
mm
in.
200
7.9
200
7.9
lifting space
lifting space
300
12
300
12
lifting space
lifting space
Installation
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-02Acs800-u2

Table of Contents