ABB ACS800 Hardware Manual page 61

45 / 60 to 560 / 600 kw
Hide thumbs Also See for ACS800:
Table of Contents

Advertisement

Units with EMC screen (+E202)
Remove the EMC screen by undoing the five fastening screws.
Note: The screen must be replaced when the cables have been connected. Tightening torque of the
fastening screws is 5 Nm (3.7 lbf ft).
Lead the power (input, motor and optional brake) cables through the lead-through plate:
1. Make adequate holes in the grommets to fit them tightly on the cables.
2. Lead the cables through the holes and slide the grommets onto the cables.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
V2
U2
UDC+
R+
UDC-
W2
PE
61
Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-02Acs800-u2

Table of Contents