Step 6.
Set the project data to use the station No. switching.
If [Screen] →[Screen Property] from the menu is selected, the [Screen Property] dialog box is displayed.
Tick the check box of [Switch Station No.] in the [Basic] tab.
Perform this operation in all screens where the station No. is switched.
Step 7.
Place objects on the screen.
Finally, place objects on the screen.
Select [Host] for Network Setting.
When the station No. switching device value is 0, the host is monitored.
Transfer the project data to the GOT and check the operation.