Section 3 Configuration
Activation of an upload is done from the Upload Execution tab on the System
Connection aspect found on the Remote System object.
It is not possible to abort an upload when the finalization of the VBPG has
started. Finalization is when the message "Finalize of graphics started." is shown
in the System Connection aspect. Abort can take long time if the provider has
started an OPC-property scan.
Figure 27. System Connection, Upload Execution Tab
If the second State field shows "Connected" it is possible to start an upload by
pressing the "Upload" button. The first State will then show that an upload is
running. The progress of the upload can be followed in the upload messages
window.
It is not possible to execute several uploads in parallel. Always finish an upload
before a new one is started.
The list of aspect categories shown in the Upload Execution tab is the aspects with
the Copy at upload check box selected. However, it is possible to override the