Control circuit specifications
Wiring of the control circuit of the 75K or more
For wiring of the control circuit of the 75K or more, separate away from wiring of the main circuit.
Make cuts in rubber bush of the inverter side and lead wires.
Rubber bush
(view from the inside)
Make cuts along the lines inside with
a cutter knife and such.
2.3.5
When connecting the operation panel using a connection cable
When connecting the operation panel (FR-DU07) to the inverter using a cable, the operation panel can be mounted
on the enclosure surface and operationality improves.
Operation panel(FR-DU07)
REMARKS
· Overall wiring length when the operation panel is connected: 20m
· Refer to the following when fabricating the cable on the user side.
Commercially available product examples
(as of Apr, 2004)
Product
1) 10BASE-T cable
2) RJ-45 connector
* Do not use pins No. 2, 8 of the 10BASE-T cable.
Refer to page 177 for RS-485 communication.
32
Parameter unit connection cable
(FR-CB2
)(option)
Operation panel connection connector
(FR-ADP)(option)
Type
SGLPEV-T 0.5mm × 4P *
5-554720-3
Maker
Mitsubishi Cable Industries, Ltd.
Tyco Electronics Corporation
<Wiring>