Mitsubishi Electric F700 Instruction Manual page 288

Fr-f720-0.75k to 110k; fr-f740-0.75k to 560k
Hide thumbs Also See for F700:
Table of Contents

Advertisement

Outline dimension drawings
• Operation panel (FR-DU07)
<Outline drawing>
3
72
78
81
• Parameter unit (option) (FR-PU07)
<Outline drawing>
*1
• Parameter unit (option) (FR-PU04)
<Outline drawing>
72
Select the installation screws whose length will not exceed the effective depth of the installation screws threads.
280
<Panel cutting dimension drawing>
3.2max
2-M3 screw
16
3
25
25.05
(14.2)
83
*1
*1
*1 When installing the FR-PU07 on the enclosure, etc., remove screws for
fixing the FR-PU07 to the inverter or fix the screws to the FR-PU07 with
M3 nuts.
*2 Select the installation screws whose length will not exceed the effective
80.3
depth of the installation screws threads.
<Panel cutting dimension drawing>
15
10.5
Panel
FR-DU07
21
Air-
bleeding
hole
20
72
<Panel cutting dimension drawing>
(11.45)
40
*1
26.5
16.5
24
48
13
11.75
5-M3 screw
Effective
depth 4.5
40
27.8
Cable
Operation panel connection connector
(FR-ADP option)
40
Air-bleeding
hole
4-R1
4-φ4 hole
26.5
Effective depth 5.0)
(
M3 screw *2
23.75
5-φ4 hole
1.25
40
(Unit: mm)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents