Toro Groundsmaster 4100-D Service Manual page 303

Hide thumbs Also See for Groundsmaster 4100-D:
Table of Contents

Advertisement

Installation (Fig. 13)
1. Position spindle on cutting deck noting orientation of
grease fitting (Fig. 15). Secure spindle assembly to deck
with removed fasteners.
2. Install cutting blade, anti--scalp cup and blade bolt.
Tighten blade bolt from 88 to 108 ft- -lb (119 to 146
N- -m).
3. Slowly rotate cutting blades to verify that blades do
not contact any deck component(s).
4. Install drive belt and adjust belt tension (see Idler As-
sembly Installation in this section).
5. If drive spindle was removed, install hydraulic motor
to cutting deck (see Cutting Deck Motor Installation in
the Service and Repairs Section of Chapter 4 -- Hydrau-
lic System).
IMPORTANT: Pneumatic grease guns can produce
air pockets when filling large cavities and therefore,
are not recommended to be used for proper greas-
ing of spindle housings.
6. Attach a hand pump grease gun to grease fitting on
spindle housing and fill housing cavity with grease until
grease starts to come out of lower seal.
7. Install belt covers to cutting deck.
1
5
3
5
1. Driven spindle
2. Driven spindle (high pulley)
Groundsmaster 4100--D/4110--D
5
5
2
Figure 15
3. Drive spindle (wing deck)
4. Drive spindle (center deck)
Page 8 - - 17
2
1
Figure 14
1. Flange head screw
3
4
1
5. Spindle grease fitting location
1
2. Hydraulic motor
1
5
5
Cutting Deck

Advertisement

Table of Contents
loading

This manual is also suitable for:

30449Groundsmaster 4110-d30447

Table of Contents