Cisco Room Kit EQX Installation Manual page 65

Hide thumbs Also See for Room Kit EQX:
Table of Contents

Advertisement

23.3. Adjust the VESA rail position
In step 23.1, you measured the distance
A
of the screen and the T-mark on the grille.
If
A
was larger than +/- 15 mm (0.59 in.), you must move the
rails up or down accordingly. Otherwise, you will not be able
to adjust the screen height to match the T-mark in step 26.
You can move the rail in steps of 30 mm (1.18 in.).
If the screen was too low,
Two screws on
each side hold
the rail in place.
If the screen was too high,
D15519.02 | 2024 JANUARY | Cisco Room Kit EQX Installation Guide
between the top
1. Hold the VESA rail, while you unscrew the four screws
that holds it in place.
2. Move the rail to the best position (giving the smallest
possible A).
3. Insert the screws again and tighten to hold the rail firmly
in its new position.
4. Move the other VESA rail to the same position.
move the rail up
move the rail down
Two screws on each side hold
the rail in place.
65
Hint: The rails may move a little
sideways when you lift or lower
them. Check that the screen
bracket stoppers for both
screens are still at the distance
C
measured in step 23.2.
If the screen was too low,
move the rail up
If the screen was too high,
move the rail down
Copyright © 2024 Cisco Systems, Inc. All rights reserved.
Two screws on
each side hold
the rail in place.

Advertisement

Table of Contents
loading

Table of Contents