Replacing The Operations Counter - GE GL 311 F3/4031 P/VE Operating Instructions Manual

High voltage circuit breaker
Hide thumbs Also See for GL 311 F3/4031 P/VE:
Table of Contents

Advertisement

T
ROUBLESHOOTING
8.2.3

Replacing the Operations Counter

68 / 146
• Detach the operating link (1).
1
Operating link
2
Operations counter
• Remove the operations counter (2) by unscrewing the four M3
mounting screws.
• Set the new operations counter manually to indicate the number
of operations shown on the old operations counter (so that it will
be possible later to determine the life of the breaker).
• Mount the new operations counter.
• Reattach the operating link.
OI 250 (EN)
1
2
REV7
-
-
/REV2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gl 312 f3/4031 p/ve

Table of Contents