Operating Condition - GE GL 311 F3/4031 P/VE Operating Instructions Manual

High voltage circuit breaker
Hide thumbs Also See for GL 311 F3/4031 P/VE:
Table of Contents

Advertisement

12.1.2

Operating condition

H
REV7
/REV0
The shut-off valve Q1 is open, the gas compartments (G1) and
(G2) are connected to each other. The density monitor P1 monitors
the gas in the switchgear gas compartments. The central fill cou-
pling (X1) permits filling of the switchgear with gas or extraction of
gas.
The actuation lever (H) is placed horizontally.
The operating condition is secured against accidental damage by
the latch (R).
The bore (PL) permits switch position securing by a padlock (VHS).
OI 250 (EN)
S
E
PECIAL
QUIPMENT
PL
A
DR
R
(O
)
PTIONAL
VHS
A
107 / 146

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gl 312 f3/4031 p/ve

Table of Contents