Replacing The Operations Counter - GE GL 310 F3/4031 P/VR Operating Instructions Manual

High voltage circuit breaker
Table of Contents

Advertisement

T
ROUBLESHOOTING
8.2.3

Replacing the Operations Counter

60
• Detach the operating link (1).
1
Operating link
2
Operations counter
• Remove the operations counter (2) by unscrewing the four M3
mounting screws.
• Set the new operations counter manually to indicate the number
of operations shown on the old operations counter (so that it will
be possible later to determine the life of the breaker).
• Mount the new operations counter.
• Reattach the operating link.
OI 248 (EN)
1
2
REV6
-
-
/REV2

Advertisement

Table of Contents
loading

Table of Contents