Installing The Alarm Light Panel - Honeywell Experion Orion Console Installation Manual

Table of Contents

Advertisement

Chapter 3 - Installing an Experion Orion Console

Installing the alarm light panel

26
5. Thread the cable along the slat wall and down into the slat rail
post.
6. Pull the cable down the slat rail post and into the flexible cable
track.
7. Thread the cable through the opening in the equipment tray and
onto the cable tray above the workstation. Excess cable length can
be secured and rested on the cable tray.
8. Connect the HDMI cable to the workstation.
To run the work surface cables
1. Open the work surface power socket lid and thread any USB or
other device cables through the opening. You can move the cable
along the work surface slot to the required location.
2. Under the work surface, thread the cable through the under work
surface cable management and into the flexible cable track.
3. Thread the cable through the opening in the equipment tray and
then connect it to the related equipment.
4. Unfasten the power cable for the work surface.
5. Pull the cable down into the flexible cable track.
6. Thread the cable through the opening in the equipment tray and
then push the power cable plug into the power strip.
7. Connect any work surface devices requiring power to the work
surface power sockets located under the work surface power
socket lid, and thread any excess cable lengths through the
opening where they can be secured under the work surface cable.
Install the alarm light panel on the top of the slat rail.
Install the alarm light panel by carefully placing the alarm panel into
the groove on the top of the slat rail.
At the rear of the slat rail, towards the top, there are five screws that
hold the alarm light panel to the slat rail.
To install the alarm light panel
1. At the rear of the slat rail, towards the top, unscrew and remove
each of the five screws.

Advertisement

Table of Contents
loading

Table of Contents