Unpacking The Experion Orion Console - Honeywell Experion Orion Console Installation Manual

Table of Contents

Advertisement

Item Description
1
Console base. Includes the console legs, lower raceway, equipment tray, and
lift columns.
2
Work surface. Includes the work surface, slat posts, slat rail, and slat wall.
Not visible in the isometric figure is alarm light panel, which is located on top
of the work surface.
3
Platform. This is installed in the shipping crate to support the console base
during transportation. This platform is installed over the work surface and
alarm light panel components in the shipping crate, and must be removed to
access them.
The console base, work surface, and alarm light panel components
are wrapped in packing material.
Auxiliary unit components
Auxiliary units are shipped in a separate crates. These crates may not
be standard, and are customized depending on the number of
auxiliary units being shipped. The contents of each crate will be clearly
identified and itemized on the shipping documents. Each auxiliary
unit will be shipped as two pieces:
1. Auxiliary unit base
2. Work surface

Unpacking the Experion Orion Console

Details about the Experion Orion Console shipping create and how to
unpack and transport it.
Unpacking the Experion Orion Console shipping crate
You may need to open the shipping crate and unpack its contents at
or near the location where you received the shipping crate, unless
your facility has wide corridors and double doors leading from this
location to the final position.
Remove the components from the shipping crate in the following
order.
Chapter 3 - Installing an Experion Orion Console
13