Attaching Monitors To The Experion Orion Console - Honeywell Experion Orion Console Installation Manual

Table of Contents

Advertisement

8. Repeat for the other flexible cable track.
To attach the work surface to an auxiliary unit base
1. With the assistance of 1 other person, lift the work surface and
2. When the mounting points under the work surface align with the
3. When you have all bolts attached, you can tighten them.
Attaching monitors to the Experion Orion
Console
Attach the high-definition monitors to the slat rails on the Experion
Orion Console.
The instructions for attaching monitors to the Experion Orion Console are
available as a video on YouTube.
http://youtu.be/iulroSB9HB8
An outline of the steps required to attach the monitors is also provided below.
Prerequisites
n
n
other bracket hole. A small screw driver might help to slide the
flexible cable track into place.
The work surface is now attached to the console base.
align the mounting holes on the bottom of the work surface with
the mounting holes on the base unit.
mounting holes on the base unit, insert and loosely tighten the
bolts. While you are attaching the work surface, make sure
someone else is holding the work surface steady.
The work surface is now attached to the auxiliary unit base.
The console base should be in its final position, with the work
surface attached.
You will need the mounting tools and fasteners from the toolkit.
TIP: Honeywell recommends that you install and adjust the
monitors with the following in mind:
Chapter 3 - Installing an Experion Orion Console
21

Advertisement

Table of Contents
loading

Table of Contents