Placing The Experion Orion Console Into Position - Honeywell Experion Orion Console Installation Manual

Table of Contents

Advertisement

Chapter 3 - Installing an Experion Orion Console
Unpacking
order
7
Placing the Experion Orion Console into
position
18
Item
Detailed unpacking information
remove the alarm light panel covering film until it is
fitted into place in the slat rail.
Remove alarm light panel.
Work
CAUTION: At least four people are required to lift
surface
and move the semi-assembled work surface, one
person on either side of the work surface, one at
the front and one at the rear of the middle of the
work surface. The weight is 104 kg (230 lbs).
Remove the work surface.
If the shipping crate is not in the final location, place the
work surface directly onto a dolly or trolley to transport it
to the final location.
Unpacking accessories and auxiliary equipment
Unlike the consoles which have standard crate and packing, the crate
and packing for any accessories and auxiliary units may vary
according to what is being shipped.
Auxiliary units always consist of two pieces: a work surface and the
base units which require assembly for installation. Those items should
be unpacked following the same instructions provided above for the
main base unit and work surface.
Considerations for placing the Experion Orion Console and any
auxiliary units into position. Once the console is in position, you will
need to level the console.
When deciding on where to place an Experion Orion Console, you
need to consider the space requirements at the rear of the console
and the location of entry points for electrical and data connections in
and out of the console.

Advertisement

Table of Contents
loading

Table of Contents