Ferrites - Honeywell MPA2 Installation Manual

Access control unit
Hide thumbs Also See for MPA2:
Table of Contents

Advertisement

Figure 2: MPA2 Standard Enclosure Panel Wiring and Components
Maintain at least a 0.25-inch (0.65 cm) distance between the
Note:
non-power limited wiring (110/220 VAC/50-60 Hz input wiring, power line
filter wiring, and battery backup/charger wiring) and all other wiring, which
is power-limited Class 2 wiring.

2.1 Ferrites

All EMC/CE/FCC compliancy testing was executed using in this manual
specified CAT7 F/STP cable.
Emission compliancy tests have been executed using a ferrite on following
RJ45/USB connections (when used):
J4 = Main Ethernet; USB2 = Host; J16 = Interface Bus; J17 & J18 =
Downstream Bus.
See below the ferrite specification:
MPA2 Access Control Unit Installation Guide, Document 800-25395 - B
Installing the MPA2 Panels
Panel Components and Descriptions
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents