3.3 Mechanical installation

As the installation place can be chosen among different construction materials, the inverter can be installed by different
mounting methods. Taking the typical installation environment as the example, the manual describes how to install the
inverter on concrete wall.
The inverter should be mounted in a vertical position of 90°to the horizontal line as shown in figure 9 (see 3.2.2
"Installation place").

3.3.1 Installation of three-phase inverters

Size of installation brackets:
AS-IC01-4000 / AS-IC01-4000-2 / AS-IC01-5000 /
AS-IC01-5000-2 / AS-IC01-6000-2 /
AS-IC01-8000-2 / AS-IC01-10000-2
Please follow the below installation steps for three-phase inverters AS-IC01 and AS-IC01-2 (4 to 10 kW):
1.
Use the punch positioning plate in the packaging box to determine the punch position as shown in Figure 11A.
Level the holes with a level ruler and mark them with a marking pen.
2.
Drill 4 installation holes into the wall according to the marked holes as in Figure 11B.
PD201809 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.2-18 EN
Model
Table 11: Size of installation brackets
Figure 11A: Mark the hole position
Figure 10: Installation bracket
Installation hole spacing
A (mm) * B(mm)
260*45
Figure 11B: Drill into the marked holes