AEG AS-IC01 Installation Instructions Manual page 22

Three-phase grid-tied solar inverter 4 kw to 10 kw
Table of Contents

Advertisement

21
3.
Fix the expansion bolts to the 4 installation holes with a hammer as shown below:
4. Fix the installation brackets to the expansion bolts and ensure the installation is firm enough (tightening
torque: 13 N•m). See Figure 11D.
5.
Hang the inverter to the installation bracket and ensure the installation is firm enough.
Figure 11D: Fixing the installation brackets
6. Ensure that the inverter is installed properly and tighten the M5 x 20 bolts into the screw holes on the left and
right side of the inverter (tightening torque: 3 N•m) as shown below.
PD201809 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.2-18 EN
Figure 11C: Fixing the expansion bolts
Figure 11E: Inverter installation
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

As-ic01-2

Table of Contents