Concluding Steps - Fujitsu PRIMERGY CX2560 M4 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX2560 M4:
Table of Contents

Advertisement

Cables

12.3.4 Concluding steps

Perform the following procedures:
"Installing the server node in the server enclosure" on page 67
Ê
Ê If applicable, reconnect all external cables.
"Switching on the server node" on page 69
Ê
"Updating or recovering the system board BIOS and iRMC" on page 77
Ê
applicable)
"Enabling SVOM boot watchdog functionality" on page 88
Ê
440
Upgrade and Maintenance Manual
(if
CX2550/60/70 M4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2550 m4Primergy cx2570 m4

Table of Contents