Concluding steps

Perform the following steps:
"Installing the server node in the server enclosure" on page 67
Ê
I
If the Global error LED is flashing with error message "CPU has been
changed" on display after the system is powered on, please follow the
procedure below.
Ê Restart the system and wait until the screen output appears.
Ê Press the [F2] function key.
Ê If a password is assigned, enter this password and confirm with the
[Enter] key.
The BIOS setup Main menu will be displayed on the screen.
Ê Select "Commit settings and Exit" on Exit menu.
Confirm LED no flashing.
Ê
This information is only regarding to the change of CPU configuration.
There is no technical problem.
"Updating or recovering the system board BIOS and iRMC" on page 77
Ê
applicable)
"Enabling replaced components in the BIOS" on page 89
Ê
"Controls and indicators on the server node" on page 448
Ê
"Enabling replaced components in the BIOS" on page 89
Ê
"Resetting the error status after replacing CPUs" on page 103
Ê
"Enabling SVOM boot watchdog functionality" on page 88
Ê
222
Upgrade and Maintenance Manual
(if
CX2550/60/70 M4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2550 m4Primergy cx2570 m4

Table of Contents