Figure 235: Disconnecting power cables and I2C cable from the PIB
Ê Connect the power cables of GPGPU 1 (1), GPGPU 2 (2) and the I2C cable
(3) to the PIB.

10.11.4 Concluding steps

Perform the following procedures:
"Installing the server node in the server enclosure" on page 67
Ê
Ê If applicable, connect all external cables to the server node.
"Controls and indicators on the server node" on page 448
Ê
"Enabling SVOM boot watchdog functionality" on page 88