Three-phase grid-tied solar inverter as-ic01 series and as-ic01-2 series (4 kw to 10 kw)
Table of Contents

Advertisement

5
Do not carry out any wiring and inspection nor change components when the inverter is connected
to power supply. Hazardous voltages may still be present in the inverter even when the AC and DC
main switches are turned off. Wait at least 5 minutes after switching off the inverter to undertake any
operation on the inverter. This ensures that the capacitors are electrically discharged.
5 minutes
The product can cause a DC current to be generated in the external protective earth conductor. In
case of direct or indirect contact, a residual current-operated protective (RCD) or monitoring (RCM)
device is strongly recommend to be used for protection. Only a RCD or RCM of Type B is allowed on
the product's supply side.
Ensure that there is no electromagnetic interference from other electrical and electronic equipment
at the installation site.
Do not unauthorizedly refit the inverter.
All the electric installation needs to be compliant with the national or local laws and standards.
The temperature of individual parts or the enclosure of the inverter –especially the heat sink– may
become hot during and due to normal operation. Avoid possible burns. Do not touch.
The inverter must be grounded before operation.
5
Do not unauthorizedly open the inverter cover. The electrical parts and components inside the
inverter are electrostatic. Take measurements to avoid electrostatic discharge during relevant
operations.
PD201709 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.1-17 EN