16
Ensure there is sufficient space (clearance) for heat releasing. Generally, the below listed clearance requirements
should be met:
Position
Lateral
Top
Bottom
PD201709 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.1-17 EN
Minimum clearance
200mm
450mm
450mm
Do not remove any inverter part or component, otherwise damage to the device and physical injury
may occur.
Figure 8: Installation space
Table 8: Minimum clearance
Figure 9: Installation position
16