26
Inverter state
Manual turn off
5.2 Operation panel
There are 4 buttons on the panel:
1.
"ESC", exit and return ;
2.
" ", back to the front page and data increasing;
3.
" ",to the next page and data decreasing;
4.
The inverter can be turned on and off by pressing the buttons: press "ESC" and "ENT" (about 3 seconds) at the same
time; this activates the quick start-up and stop function.
5.3 LCD display
Operation panel
PD201709 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.1-17 EN
LED indicators
Run
Warn
Fault
Run
Warn
Fault
Please refer to chapter 5 and 7 for detailed fault information and troubleshooting.
"ENT", enter.
Red indicator is on, others are off :
Current-leakage or unqualified output power energy of the
inverter (E007, E010, E014, E017, E018 or E020). De-couple the
inverter from the system before maintenance.
All indicators are on:
Stop after the communication or panel command.
Table 15: Inverter states
LCD screen
Figure 15: Operation panel
Description
LED indicators
Operation panel
26