8.9 Powering On the Smart PCS
Precautions
● Before turning on the AC switch between the Smart PCS and the power grid,
● If the Smart PCS has not been used for six months or longer after being
Procedure
Step 1 Turn on the AC switch between the Smart PCS and the power grid.
Step 2 Turn on the DC switches between the Smart PCS and the DC LV Panel busbar.
Step 3 Observe the LED indicators to check the running status of the Smart PCS.
----End
Indicator Description
You can view the running status of the Smart PCS by observing the LED indicators
on the panel.
Figure 8-12 LED indicators
Issue 15 (2023-11-01)
NO TICE
check whether the AC voltage is within the required range using a multimeter.
(See the local power grid standard.)
installed, it must be checked and tested by professionals before operation.