LUNA2000-2.0MWH Series Smart String ESS
User Manual

6.2 Connecting Socket Circuit Wires

Scenario 1
This procedure applies only to the models listed in the table below.
Models
LUNA2000-2.0MWH-1HX
LUNA2000-2.0MWH-2HX/
LUNA2000-2.0MWH-HE2HX
Figure 6-3 Before installing the socket
(1) Cable binding position
Step 1 Select a 110 V or 220 V socket as required.
Step 2 Connect the live wire and neutral wire.
Issue 15 (2023-11-01)
NO TE
● Cables 1733, 1735, 1734 and 1736 are pre-installed. Cables 1751, 1752, 1757, 1760,
2055, 2056, 1761 and 1762 need to be installed.
● The cables to be installed can be obtained from the cable binding position shown in the
figure before installing the socket.
Installing a 110 V socket
a.
Connect the live wire and neutral wire from the mains to positions 1 and
2 of the XT9 terminal block.
Copyright © Huawei Technologies Co., Ltd.
Air Conditioner Position in the
Battery Cabin
1/3/5/7/9/11
1/4/7/10
6 Installing Cables
140