Step 1 Secure the fastener of the T/H sensor to the wall or ceiling near the UPS.
Step 2 Install the T/H sensor on the fastener.
Step 3 Connect the T/H sensor cables.
1.
2.
Figure 3-23 Connecting cables
(1) Cascaded with other T/H sensors
----End

3.2.3.5 Connecting the BCB Box

Open the cover of the BCB box, and connect the BCB port on the dry contact card
to the control signal port on the BCB box. For details, see the
(0250,0400,0630)DC0384BXA BCB Box User Manual or PDU8000-
(0125,0250,0400,0630,0800) DCV8-BXA001 BCB Box User Manual .
Issue 17 (2023-07-10)
Connect the RS485-IN port on the T/H sensor to the COM1 port on the
MUS05A monitoring interface card.
Connect the RS485-OUT port on the T/H sensor to the RS485-IN port on
another T/H sensor.
NO TICE
COM1 is a 6-pin port. Use a communications cable with a connector of 6–8
pins.