01
Installation Preparations
1. Before installation, read the user manual carefully to get familiar with product information and safety precautions.
2. Use insulated tools when installing the equipment.
3. Only engineers certified by Huawei or its agent are allowed to install, commission, and maintain the UPS. Otherwise,
personal injury or equipment damage may occur, and the resulting UPS faults are beyond the warranty scope of Huawei.
4. This document describes the installation procedure for a single UPS. For details about how to install a parallel system,
contact Huawei technical support.
Model
Weight
UPS5000-H-1200K-NT
< 1600 kg
UPS5000-H-1600K-NT
< 2300 kg
Clearances and Copper Bar Location (1200 kVA)
Installation
Clearances
Front View of the Distance Between
Copper Bars on the Top (unit: mm)
UPS5000-H-(1200 kVA-1600 kVA) Quick Guide (100 kVA Power Modules)
Dimensions (H x W x D)
2200 mm x 1600 mm x 1000 mm
2200 mm x 2400 mm x 1000 mm
Top view of the Distance Between Copper Bars on the Top (unit: mm)
Recommended space for connector boxes (If one power source is
used, a connector box must be deployed for the copper bars that
are not installed in the busway. Copper bars must not be exposed.)
The area marked by the line box
is reserved for the dense busway.
Copper Bar Specifications (unit: mm)
Item
Mains input
Mains input current (A)
Bypass input
Bypass input current (A)
Output
Output current (A)
Nominal battery discharge current (A)
Battery input (lead-acid
Maximum battery discharge current (A)
battery)
Recommended cross-sectional area
(mm
2
)
Nominal battery discharge current (A)
Maximum battery discharge current (A)
Battery input (SmartLi)
Recommended cross-sectional area (mm
Equipotential ground point Recommended cross-sectional area (mm
Clearances and Copper Bar Location (1600 kVA)
Installation
Clearances
Front View of the Distance Between
Copper Bars on the Top (unit: mm)
1
Issue: 04
Part Number: 31500EKM
Date: 2021-08-03
1200 kVA
1600 kVA
Remarks
2229
2972
Connection method: Crimped DT terminal
1823
2431
Bolt Specifications:
1823
2431
L1/L2/L3/U/V/W/PE: M12 x 45 mm (47 N· m)
2660
3546
Battery +/-/PE: M16 x 55 mm (120 N· m)
3185
4247
Equipotential ground point: M6 x 20 mm (4.5 N· m)
+/-
6 x (2 x 240)
8 x (2 x 240)
NOTE:
PE
2 x 240
•
The currents listed in the table are measured at a rated voltage
2493
3324
of 380 V.
3192
4172
•
If the top cabling component and bottom cabling cabinet are
For details, see the IEC-60364-5-52
not configured, copper bars need to be prepared for the mains
2
)
specifications and
SmartLi User Manual
.
input, bypass input, and output, which cannot be directly
connected using cables. (Huawei does not provide copper bars
or connector boxes.) If they are configured, refer to the
2
) 16
recommended cable specifications in the user manual.
•
The battery input can be connected only using cables.
Top View of the Distance Between
Copper Bars on the Top (unit: mm)
Recommended space for connector boxes (If one power source is
used, a connector box must be deployed for the copper bars that
are not installed in the busway. Copper bars must not be exposed.)
Copper Bar Specifications (unit: mm)
The area marked by the line box