Huawei UPS5000-E-200K-SM User Manual page 137

50 kva power modules
Hide thumbs Also See for UPS5000-E-200K-SM:
Table of Contents

Advertisement

UPS5000-E-(200 kVA-300 kVA)
User Manual (50 kVA Power Modules)
Figure 3-76 Installing connecting kits
Step 7 (Optional) Secure the cable entry cabinet to the ground.
Step 8 Install an equipotential plate.
Figure 3-77 Equipotential plate
Step 9 Open the front door of the UPS, remove the front cover, and remove the top cover
if needed.
Issue 17 (2023-07-10)
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Installation
129

Advertisement

Table of Contents
loading

Table of Contents