Huawei UPS5000-E User Manual
Hide thumbs Also See for UPS5000-E:
Table of Contents

Advertisement

Quick Links

UPS5000-E-(50 kVA–300 kVA)
User Manual (50 kVA Power
Modules)
Issue
15
Date
2022-01-30
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei UPS5000-E

  • Page 1 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) Issue Date 2022-01-30 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document About This Document Purpose This document describes the UPS5000-E-(50 kVA–300 kVA) in terms of its features, performance, working principles, appearance as well as instructions for installation, and operation and maintenance (O&M). UPS is short for uninterruptible power system.
  • Page 4 Issue 11 (2019-12-20) Updated the safety information. Issue 10 (2019-11-11) Added SNMP descriptions to the sections about system settings and site configuration. Issue 09 (2019-10-16) Updated the instructions for startup over the app. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 5 Issue 03 (2017-04-28) Update some MDU screenshots. Issue 02 (2017-02-25) Updated the voltage and current data of the monitoring interface card. Issue 01 (2016-10-20) This issue is the first official release. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 6: Table Of Contents

    2.3.4 Control Module.................................. 33 2.3.4.1 Overview................................... 33 2.3.4.2 ECM..................................... 34 2.3.4.3 Dry contact card................................36 2.3.4.4 Monitoring Interface Card............................39 2.3.5 MDU....................................... 43 2.4 Typical Configurations................................. 46 2.4.1 Single UPS.................................... 47 Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 7 3.2.7.2 Routing Cables from the Bottom........................... 109 3.2.8 Routing Cables (UPS5000-E-300K-SM)........................118 3.2.9 Routing Cables (UPS5000-E-300K-SMT)........................ 124 3.2.10 Routing Cables (UPS5000-E-300K-SMT, Isolation Protection)..............131 3.2.11 Connecting a Remote EPO Switch.......................... 135 3.2.12 Connecting Communications Cables........................136 3.3 Installing a Parallel System............................. 136 3.3.1 Installing the UPSs................................
  • Page 8 5.1.2 Quarterly Maintenance..............................176 5.1.3 Annual Maintenance..............................177 5.2 Battery Maintenance................................. 178 5.2.1 Precautions for Battery Maintenance........................178 5.2.2 Monthly Maintenance..............................178 5.2.3 Quarterly Maintenance..............................180 5.2.4 Annual Maintenance..............................181 6 Troubleshooting........................182 7 Technical Specifications..................... 185 Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 9 7.7 Battery Specifications................................ 188 7.8 Output Electrical Specifications............................. 189 7.9 System Electrical Specifications............................. 190 A (Optional) TN-C System Application................191 B User Interface........................195 C Alarm List..........................196 D Acronyms and Abbreviations................... 197 Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd. viii...
  • Page 10: Safety Information

    ● Failure to follow the operation instructions and safety precautions on the product and in this document ● Equipment damage due to force majeure, such as earthquakes, fire, and storms Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 11 ● Keep irrelevant people away from the equipment. Only operators are allowed to access the equipment. ● Use insulated tools or tools with insulated handles, as shown in the following figure. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 12 Do not change the structure or installation sequence of equipment without permission. ● Do not touch a running fan with your fingers, components, screws, tools, or boards before the fan is powered off or stops running. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 13: Personnel Requirements

    Do not operate the equipment in the absence of a properly installed ground conductor. ● Ensure that the equipment is connected permanently to the protective ground. Before operating the equipment, check its electrical connection to ensure that it is securely grounded. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 14 0°C. Handle cables with caution, especially at a low temperature. – Cables stored at subzero temperatures must be stored at room temperature for at least 24 hours before they are laid out. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 15: Installation Environment Requirements

    Install the equipment in an area far away from liquids. Do not install it under areas prone to condensation, such as under water pipes and air exhaust vents, or areas prone to water leakage, such as air conditioner vents, ventilation Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 16 Any violations must be promptly pointed out by the site manager or safety supervisor and the involved personnel should be prompted for correction. Personnel who fail to stop violations will be forbidden from working. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 17: Mechanical Safety

    Ensure that the wider end of the ladder is at the bottom, or protective measures have been taken at the bottom to prevent the ladder from sliding. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 18 When pulling the equipment out of a cabinet, be aware of unstable or heavy objects on the cabinet to prevent injury. ● Be cautious to avoid injury when moving heavy objects. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 19: Equipment Operating Environment

    The UPS operating environment must meet the requirements for the climate indicator, mechanically active substance indicator, and chemically active substance indicator in ETSI EN 300 019-1 class 3.6. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 20 UPS is connected to a backfeed protection card. Disconnect the backfeed protection card from the UPS before operating the UPS. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 21: Battery Safety

    ● Dispose of waste batteries in accordance with local laws and regulations. Do not dispose of batteries as household waste. If a battery is disposed of improperly, it may explode. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 22 ● To prevent fire or corrosion, ensure that flammable gas (such as hydrogen) is properly exhausted for lead-acid batteries. Lead-acid batteries in use emit flammable gas. Ensure that batteries are kept in a well-ventilated area and take preventive measures against fire. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 23 Use batteries within the allowed temperature range. Otherwise, the battery performance and safety will be compromised. ● Do not throw a lithium battery in fire. ● When maintenance is complete, return the waste lithium battery to the maintenance office. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 24: Others

    UPS output voltage level or frequency. Doing so may affect the power supply to equipment. ● Exercise caution when setting battery parameters. Incorrect settings will affect the power supply and battery lifespan. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 25: Overview

    Configuration ● SM: standard configuration type ● FM: full configuration Cable routing Routed from the top (only the UPS5000-E-300K-SMT model contains "T") This document describes the following UPS models: ● UPS5000-E-200K-SM/FM The models provide four configurations: 50 kVA, 100 kVA, 150 kVA, and 200 kVA.
  • Page 26: Working Principle

    NO TE ● The UPS5000-E-200K-SM supports cable routing from the top or bottom. ● The UPS5000-E-200K-FM supports cable routing from the top and can support cable routing from the bottom if a cable entry cabinet is installed for the non-isolation protection model.
  • Page 27: Working Modes

    In bypass mode, loads are powered by the bypass module. The bypass power supply is not protected by the UPS and therefore is prone to the mains outage, abnormal AC voltage waveform, or abnormal frequency. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 28: Battery Mode

    If the mains input is abnormal or the rectifier becomes abnormal, the UPS transfers to battery mode. The power module obtains DC power from batteries, and the power is converted into AC output by the inverter. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 29: Maintenance Bypass Mode

    2.2.2.4 Maintenance Bypass Mode When the UPS works in maintenance bypass mode, the current flows through the maintenance bypass instead of the power module. You can maintain the circuit inside the cabinet. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 30: Eco Mode

    UPS transfers from bypass mode to inverter mode. In bypass mode or normal mode, the rectifier keeps working and charges batteries using a charger. The ECO mode delivers a high efficiency. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 31: Product Introduction

    Figure 2-7 UPS conceptual diagram in ECO mode NO TE Manual startup is required to ensure that the inverter is in standby state and the power flow has reached the inverter. 2.3 Product Introduction Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 32: Structure

    UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 2 Overview 2.3.1 Structure Figure 2-8 UPS5000-E-200K-SM front view (1) Power modules (2) Bypass module (3) Control module (4) Power distribution subrack cover (5) Filler panels (6) Monitor display (7) Maintenance...
  • Page 33 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 2 Overview Figure 2-9 UPS5000-E-200K-FM front view (1) Power distribution (2) Bypass input switch (3) Maintenance (4) Mains input switch subrack cover bypass switch (5) Output switch (6) Control module (7) Bypass module...
  • Page 34 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 2 Overview Figure 2-10 UPS5000-E-200K-FM (isolation protection) front view (1) Cover (2) Mains input switch (3) Bypass input switch (4) Maintenance bypass switch (5) Output switch (6) Control module (7) Bypass module...
  • Page 35 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 2 Overview Figure 2-11 UPS5000-E-300K-SM front view (1) Power modules (2) Bypass module (3) Control module (4) Power distribution subrack cover (5) Monitor display (6) Filler panels (7) Maintenance (8) Folder...
  • Page 36 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 2 Overview Figure 2-12 UPS5000-E-300K-SMT front view (1) Power distribution (2) Maintenance (3) Control module (4) Bypass module subrack cover bypass switch (5) Power modules (6) Monitor display (7) Filler panels...
  • Page 37 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 2 Overview Figure 2-13 UPS5000-E-300K-SMT (isolation protection) front view (1) Cover (2) Maintenance (3) Control module (4) Bypass module bypass switch (5) Power modules (6) Monitor display unit Issue 15 (2022-01-30)
  • Page 38: Power Module

    The module is not configured, the inverter fast software and rectifier software are being upgraded, or the inverter software is being upgraded (blinking at 4 Hz, on for 0.125s and off for 0.125s). Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 39: Bypass Module

    Weight: ≤ 35 kg ● Rated output capacity: 50 kVA/50 kW ● Power density: 50 kVA/3 U 2.3.3 Bypass Module Appearance Figure 2-15 shows a bypass module of a 200 kVA UPS. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 40 (3) Run indicator (4) Alarm indicator (5) Fault indicator (6) Ready switch (7) Signal port (8) Input and output ports Figure 2-16 shows a bypass module of a 300 kVA UPS. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 41 (blinking at 4 Hz, on for 0.125s fast and off for 0.125s). The bypass software is being upgraded. Alarm Yello Stead A minor alarm is generated for the bypass. indicator y on Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 42: Control Module

    (from left to right). The four cards are hot swappable. One subrack is reserved above the dry contact card. A backfeed protection card or dry contact extended card can be inserted into this subrack. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 43: Ecm

    The control module consists of two energy control modules (ECMs) in active/ standby mode. Figure 2-18 ECM Table 2-4 Ports on the ECM Silk Screen Description PARALLEL The PARALLEL port transmits parallel signals between racks. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 44 ● Provides module running information for the MDU. ● Controls the running of a single UPS5000 and a parallel system, and reports the UPS5000 status information to other monitoring modules. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 45: Dry Contact Card

    Table 2-6 Ports on the dry contact card Silk Screen Description Status Initial Status Port for detecting ● Connected: battery Disconnected battery grounding grounding fault faults ● Disconnected: no battery grounding Port for signal fault ground Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 46 Port for signal STATUS_0V ground SWITCH Port for monitoring ● Disconnected: Disconnected STATUS_MT the maintenance circuit breaker ON circuit breaker ● Connected: circuit breaker OFF SWITCH Port for signal STATUS_0V ground Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 47 The dry contact card allows the UPS to detect and manage the switch status of the battery system (including the external battery switch) and implement remote EPO. Specifications ● Hot-swappable ● 0.5 U high Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 48: Monitoring Interface Card

    Table 2-7 Ports on the monitoring interface card Port Silk Description Screen DO_1 ● DO_1, DO_2, DO_3, and DO_4 indicate alarm outputs. The default values are Critical alarm, Minor alarm, Bypass mode, and Battery mode, respectively. DO_2 Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 49 ● Signal cables must be double-insulated twisted cables. If the cable length is 25–50 m, the cross-sectional area must be 0.5–1.5 mm ● RS485 cables and FE cables must be shielded cables. Figure 2-22 Figure 2-23 are recommended wiring methods for DO ports. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 50 User Manual (50 kVA Power Modules) 2 Overview Figure 2-22 Wiring method 1 Figure 2-23 Wiring method 2 Figure 2-24 COM1 pins Table 2-8 COM1 pin definition Description RS485- RS485+ 12V_PORT Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 51 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 2 Overview Figure 2-25 COM2 pins Table 2-9 COM2 pin definition Description RS485+ RS485- RS485+ RS485- CANH0 CANL0 Figure 2-26 RS485 pins Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 52: Mdu

    RS485+. Twist cables to pin 2 and pin 5 into one cable and then connect it to RS485–. 2.3.5 MDU There are two types of MDUs. Appearance Figure 2-27 MDU (flat LCD) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 53 The UPS is running properly or a warning has been generated. The MDU is powered off. NO TE The indicator on the MDU panel is yellow when the bypass supplies power in non-ECO mode. Figure 2-29 MDU ports Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 54 Figure 2-30 Ports on the old MDU Table 2-13 Port description for the old MDU Port Name Description MUS05A (DB26) Connects to the MDU and monitoring interface card Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 55: Typical Configurations

    Application Scenario Single UPS Supplies power to common loads. Parallel system Supplies power to important loads in small- and medium- sized data centers. It features high availability and strong transient overload capability. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 56: Single Ups

    UPSs are connected over parallel cables to synchronize UPS outputs to supply power to loads. If one UPS fails, the other UPSs continue supplying power to loads. Figure 2-31 Conceptual diagram of an N+X parallel system Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 57: Dual-Bus System

    An optional static transfer switch (STS) can be installed to start the bus synchronization controller (BSC). The UPS systems work in normal mode or bypass mode. Figure 2-32 Conceptual diagram of a dual-bus system Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 58: Optional Components

    The position for installing the surge protection box subrack and ECM expansion subrack is the same, and therefore the two types of subracks cannot be used simultaneously. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 59 Top air- Exhausts air from the top. flow cabinet Cable If a cable entry cabinet is installed, entry cables can be routed in and out from cabinet the bottom of the cabinet. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 60 ● The IP21 component cannot be configured for the UPS5000-E-300K-SMT and UPS5000- E-200K-FM. If cables are routed in and out from the top for the UPS5000-E-200K-SM, the IP21 component cannot be configured. ● A cable entry cabinet can be installed only for the non-isolation protection model of UPS5000-E-200K-FM.
  • Page 61: Installation

    Ensure that the floor or installation support can bear the weight of the UPS5000, batteries, and battery racks. The weight of batteries and battery racks depends on the UPS configuration for the site. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 62: Installation Environment

    Do not install the UPS in environments with conductive metal scraps in the air. ● The optimal operating temperatures for valve-regulated lead-acid batteries (VRLA batteries) are 20–30°C. Operating temperatures higher than 30°C Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 63: Installation Clearances

    Figure 3-2 Reserved clearances (unit: mm) 3.1.2 Tools and Instruments CA UTION Insulate installation tools to prevent electric shocks. Prepare the following tools and meters indicated in Table 3-1 for installation. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 64 Crimping tools Wire stripper Electric hydraulic pliers Clamp meter Multimeter Cable tie Level instrument Insulation tape Cotton cloth Label Electrician's knife Electrostatic Protective gloves Insulated gloves Insulation discharge (ESD) protective shoes gloves Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 65: Preparing Power Cables

    ● The TN-C system is supported when the input N and PE are connected. Table 3-2 lists the recommended cross-sectional areas for power cables. Note that the currents listed are measured at a rated voltage of 380 V (line voltage). Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 66 Recomme 3 x 35 3 x 95 2 x (3 x 2 x (3 x 2 x (3 x 2 x (3 x nded 120) 150) 185) cross- sectional Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 67 (IEC-60364-5-52 C standards). 300 kVA: The cables are routed over a ladder or bracket in a single layer (IEC60364-5-52 F standards). The distances between cables must be greater than twice the cable diameter. – The ambient temperature is 30°C. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 68 DC power cable should not be longer than 50 meters. Table 3-3 Table 3-4 list the requirements for power cable terminals of the UPS5000-E-200K-SM/FM. Table 3-3 Power cable terminal requirements for the UPS5000-E-200K-SM Port Connection Bolt Bolt Hole...
  • Page 69 100 A/3P UPS5000- breaker E-300K- SM/SMT Downstream output 100 A/3P circuit breaker 100 kVA Mains input circuit 250 A/3P breaker Bypass input circuit 160 A/3P breaker Downstream output 160 A/3P circuit breaker Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 70 ● If multiple loads are connected, specifications for branch circuit breakers must not exceed the recommended specifications. ● The circuit breaker selection principle is to protect loads and cables, and the cascading principle is to realize specific protection. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 71: Transportation, Unpacking, And Checking

    Step 2 Check the UPS packing. Step 3 Hold the sliding plate steady. Cut and remove the binding tapes. Put down the sliding plate gently. Figure 3-3 Removing binding tapes Step 4 Remove packing materials. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 72 Tighten the two screws in step 2 in Figure 3-5. Otherwise, the slide plate may move when the UPS is removed. Step 8 Raise the four anchor bolts to the highest position using an adjustable wrench. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 73: Installing A Single Ups

    ----End 3.2 Installing a Single UPS 3.2.1 Installing a UPS Cabinet Secured Installation Step 1 Determine the cabinet installation position. Draw mounting holes in the installation position according to the drawing. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 74 NO TICE Knock the expansion bolt into the hole until the expansion sleeve completely fits into the hole. The expansion sleeve must be completely buried under the ground to facilitate subsequent installation. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 75 Step 4 (Optional) If the castors of the UPS need to be lifted from the ground, perform steps Step 1 Step 2 Unsecured Installation. Step 5 Remove the rear panel of the cabinet, and then open the front door. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 76 Step 6 Remove the four plugs from the bottom of the cabinet (two at the front and two at the rear). Figure 3-11 Removing plugs Step 7 Insert four M12x115 expansion bolts into the expansion bolt holes in the floor, and tighten the expansion bolts in the direction. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 77 Figure 3-13. Figure 3-13 Castors adjustment Step 2 Check the cabinet levelness using a level. If the cabinet is not level, wrench the anchor bolts. ----End Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 78: Installing Batteries

    (With a marking-off template) Determine the installation positions for the antiseismic kits based on the delivered marking-off template, and mark mounting holes. ● (Without a marking-off template) Mark mounting holes based on the following figure. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 79 (With a marking-off template) Use twelve M5x16 and four M12 screws. Figure 3-15 Securing the antiseismic kits to the cabinet (with a marking-off template) ● (Without a marking-off template) Use eight M6x20 and four M12 screws. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 80: Installing An Ip21 Component

    3.2.3.2 Installing an IP21 Component Procedure Step 1 Install leveling feet at the bottom of the IP21 component, with two long feet on the front and two short feet at the rear. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 81: Connecting An Ambient T/H Sensor

    Figure 3-19 Installing the IP21 component ----End 3.2.3.3 Connecting an Ambient T/H Sensor Procedure Step 1 Connect the RJ11 port on the ambient T/H sensor to the COM1 port on the monitoring interface card. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 82: Connecting The Bcb Box

    BGA001 BBB Box User Manual . 3.2.3.6 Installing a Battery Grounding Failure Detector Procedure Step 1 Install a battery grounding failure detector. For the installation method, see UPS5000 Battery Grounding Failure Detector User Manual . Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 83 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-21 Position of a battery grounding failure detector in a UPS5000-E-200K- (1) Battery grounding failure detector Figure 3-22 Position of a battery grounding failure detector in a UPS5000-E-200K-...
  • Page 84 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-23 Position of a battery grounding failure detector in a UPS5000-E-200K- FM (isolation protection) (1) Battery grounding failure detector Figure 3-24 Position of a battery grounding failure detector in a UPS5000-E-300K-...
  • Page 85 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-25 Position of a battery grounding failure detector in a UPS5000-E-300K- (1) Battery grounding failure detector Figure 3-26 Position of a battery grounding failure detector in a UPS5000-E-300K-...
  • Page 86: Connecting The Ibat

    Step 3 Pull the marked cable out of the cabinet, cut the cable from the marked position, strip the cable, and crimp a terminal. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 87: Routing Cables (Ups5000-E-200K-Sm)

    Step 1 Ensure the maintenance bypass switch is OFF. Open the front door, and remove the cover from the power distribution subrack, as shown in Figure 3-29. The positioning of the copper bars is shown in Figure 3-30 Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 88 (1) Battery input terminals (+, (2) Mains input terminals (3) Maintenance bypass switch N, –) (1L1–1L3, N) (4) Bypass input terminals (5) Output terminals (U, V, W, (2L1–2L3, N) and N) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 89 ● Prepare the OT terminals onsite to ensure that the length of the copper wire is the same as that of the part of the OT terminal that covers the conductor. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 90 : Protection ground Step 4 Route power cables. ● Two power sources Remove the copper bars between mains and bypass input terminals, as shown Figure 3-33. Figure 3-33 Removing copper bars Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 91 Take a battery string consisting of 40 batteries as an example. A neutral wire is routed from the middle of positive and negative battery strings, each consisting of 20 batteries. Figure 3-35 Neutral wire ● One power source Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 92: Routing Cables From The Bottom

    The number and colors of signal cables in Figure 3-36 are for reference only. ----End 3.2.5.2 Routing Cables from the Bottom Context NO TICE ● Route cables for the UPS from inside out and from bottom up. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 93 Remove all the cable cover for signal cables and small covers from the bottom. Remove the two large covers from the top of the cabinet, drill holes into them, and install them to the positions where the small covers were originally. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 94 The quantity of holes in the above figure is for reference only. ▪ If holes are drilled for routing cables, attach grommet strips on the hole edges to protect cables. Step 3 Connect ground cables. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 95 Step 4 Route power cables. ● Two power sources Remove the copper bars between mains and bypass input terminals. Figure 3-40 shows power cables routed from the bottom by removing small covers, as an example. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 96 Take a battery string consisting of 40 batteries as an example. A neutral wire is routed from the middle of positive and negative battery strings, each consisting of 20 batteries. Figure 3-41 Neutral wire Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 97: Routing Cables (Ups5000-E-200K-Fm)

    The number and colors of signal cables in Figure 3-42 are for reference only. ----End 3.2.6 Routing Cables (UPS5000-E-200K-FM) 3.2.6.1 Routing Cables from the Top Context NO TICE Route cables for the UPS from inside out. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 98 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Procedure Step 1 Open the front door and remove the cover from the power distribution subrack. Figure 3-43 Removing the cover Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 99 (2) Bypass input terminals (2L1–2L3, N) (3) Battery input terminals (+, N, –) (4) Output terminals (U, V, W, and N) Step 2 Determine the cabling mode. ● Remove small covers for routing cables. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 100 Remove the cable cover for signal cables and small covers from the top. Remove the two large covers from the rear top of the cabinet, drill holes into them, and install them to the positions where the small covers were placed. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 101 ● Prepare the OT terminals onsite to ensure that the length of the copper wire is the same as that of the part of the OT terminal that covers the conductor. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 102 ● Two power sources Remove the copper bars between mains and bypass input terminals. Figure 3-48 Removing copper bars Figure 3-49 shows the cables routed from the top of the cabinet. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 103 Step 5 Route the signal cables on the left side of subracks along the left side of the cabinet and the cables on the right side of subracks along the right side of the cabinet, and then bind the cables to the cabinet, as shown in Figure 3-51. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 104: Routing Cables From The Bottom

    Figure 3-51 are for reference only. ----End 3.2.6.2 Routing Cables from the Bottom Prerequisites A cable entry cabinet is installed. Context NO TICE Route cables for the UPS from inside out. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 105 Step 3 Adjust the anchor bolts of the cable entry cabinet to make it flush with the UPS cabinet. Step 4 Install equipotential plate mounting kits on the same horizontal plane of the UPS cabinet and cable entry cabinet. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 106 Figure 3-53 Installing equipotential plate mounting kits (1) Side panel (2) Cable trough Step 5 Place the cable entry cabinet on the right of the UPS cabinet. Step 6 Install the front and rear connecting kits. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 107 Step 9 Determine the cabling mode. ● Remove small covers for routing cables. Remove a certain number of small covers from the bottom of the cable entry cabinet based on the actual cable conditions. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 108 Remove the two large covers from the bottom of the cable entry cabinet, drill holes in them based on site requirements, and install them on the positions where the small covers were placed. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 109 – The quantity of holes in the above figure is for reference only. – If holes are drilled for routing cables, attach grommet strips on the hole edges to protect cables. Step 10 Connect the ground cables. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 110 Two power sources Remove the copper bars between mains and bypass input terminals, as shown Figure 3-48. Figure 3-59 shows power cables routed from the bottom by removing small covers, as an example. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 111 Take a battery string consisting of 40 batteries as an example. A neutral wire is routed from the middle of positive and negative battery strings, each consisting of 20 batteries. Figure 3-60 Neutral wire ● One power source Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 112 Step 12 Remove the signal cable trough cover from the cable entry cabinet. Figure 3-61 Removing the cable trough cover Step 13 Connect the signal cable. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 113: Routing Cables (200 Kva, Full Isolation Protection)

    ● Before connecting cables, ensure that the switches inside the UPS, the upstream input switch and battery string switch are OFF to prevent operations with power on. ● Route cables for the UPS from inside out and from bottom up. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 114 Figure 3-63 Removing the cover Figure 3-64 Copper bar positions (1) Battery input terminals (+, N, –) (2) Output terminals (U, V, W, N) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 115 Step 2 Connect the ground cable. Figure 3-65 Grounding Step 3 Route power cables. ● Two power sources Remove the copper bar between mains and bypass input terminals. Figure 3-66 Removing copper bars Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 116 Take a battery string consisting of 40 batteries as an example. A neutral wire is routed from the middle of positive and negative battery strings, each consisting of 20 batteries. Figure 3-68 Neutral wire Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 117 Step 4 Route signal cables. Bind cables to the cabinet. Figure 3-70 Connecting signal cables Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 118: Routing Cables From The Bottom

    ● Route cables for the UPS from inside out and from bottom up. Procedure Step 1 (Optional) Determine the installation position for the cable entry cabinet, and mark mounting holes at the installation position based on drawings. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 119 Step 3 Adjust the anchor bolts of the cable entry cabinet to make it flush with the UPS cabinet. Step 4 Install the equipotential plate mounting kits on the same horizontal plane of the UPS cabinet and cable entry cabinet. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 120 Figure 3-72 Installing equipotential plate mounting kits (1) Side cover (2) Cable trough Step 5 Place the cable entry cabinet on the right of the UPS cabinet. Step 6 Install the front and rear connecting kits. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 121 Step 7 (Optional) Secure the cable entry cabinet to the ground. Step 8 Install an equipotential plate. Figure 3-74 Equipotential plate Step 9 Open the front door of the UPS, remove the front cover, and remove the top cover if needed. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 122 (2) Output terminals (U, V, W, N) (3) Bypass input terminals (2L1–2L3, N) (4) Mains input terminals (1L1–1L3, N) Step 10 Remove covers from the top of the cable entry cabinet based on the site requirements. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 123 Remove the two large covers from the bottom of the cable entry cabinet, drill holes into them based on site requirements, and install them on the positions where the small covers were placed. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 124 For the screw specifications and torque used for connecting cables in a bottom cable routing scenario, refer to the top cable routing scenario. This section only shows the cable routes in the bottom cable routing scenario. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 125 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-80 Connecting cables Step 13 Remove the signal cable trough cover from the cable entry cabinet. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 126 Step 14 Connect the signal cable. Route the control cable out of the UPS cabinet through the cable hole on the top, and then into the cable entry cabinet through the cable hole on the top of that cabinet.) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 127: Routing Cables (Ups5000-E-300K-Sm)

    ● Route cables for the UPS from inside out and from bottom up. Procedure Step 1 Open the front door, and remove the cover from the power distribution subrack, as shown in Figure 3-83. Figure 3-84 shows the positions of copper bars. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 128 N, –) (2L1–2L3, N) (1L1–1L3, N) (4) Output terminals (U, V, W, (5) Maintenance bypass switch and N) Step 2 Determine the cabling mode. ● Remove small covers for routing cables. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 129 Remove the two large covers from the top of the cabinet, drill holes into them, and install them to the positions where the small covers were originally. Figure 3-86 Hole positions Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 130 : Internal equipotential connection ● : Protection ground Step 4 Route power cables. ● Two power sources Remove the copper bars between the mains and bypass input terminals, as shown in Figure 3-88. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 131 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-88 Removing copper bars Figure 3-89 shows the power cables routed from the bottom of the cabinet. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 132 Take a battery string consisting of 40 batteries as an example. A neutral wire is routed from the middle of positive and negative battery strings, each consisting of 20 batteries. Figure 3-90 Neutral wire Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 133: Routing Cables (Ups5000-E-300K-Smt)

    Route cables for the UPS from inside out. Procedure Step 1 Ensure the maintenance bypass switch is OFF. Open the front door and remove the cover from the power distribution subrack, as shown in Figure 3-92. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 134 (3) Battery input terminals (+, (1L1–1L3, N) (2L1–2L3, N) N, –) (4) Maintenance bypass switch (5) Output terminals (U, V, W, Step 2 Determine the cabling mode. ● Remove small covers for routing cables. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 135 Remove the two large covers from the rear top of the cabinet, drill holes into them, and install them to the positions where the small covers were placed. Figure 3-95 Hole positions Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 136 : Internal equipotential connection ● : Protection ground Step 4 Route power cables. ● Two power sources Remove the copper bar between mains and bypass input terminals, as shown Figure 3-97. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 137 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-97 Removing copper bars Figure 3-98 shows the cables routed from the top of the cabinet. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 138 Take a battery string consisting of 40 batteries as an example. A neutral wire is routed from the middle of positive and negative battery strings, each consisting of 20 batteries. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 139 Step 5 Route signal cables. Bind cables to the cabinet. Figure 3-100 Connecting signal cables NO TE The number and colors of signal cables in Figure 3-100 are for reference only. ----End Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 140: Routing Cables (Ups5000-E-300K-Smt, Isolation Protection)

    UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation 3.2.10 Routing Cables (UPS5000-E-300K-SMT, Isolation Protection) Context NO TICE ● Route cables for the UPS from inside out and from bottom up. Procedure Step 1 Ensure the maintenance bypass switch is OFF. Open the front door, remove the front cover, and remove covers from the top of the cabinet based on the site requirements.
  • Page 141 (2) Bypass input terminals (2L1–2L3, N) (3) Mains input terminals (1L1–1L3, N) (4) Output terminals (U, V, W, N) Step 2 Connect ground cables. Figure 3-103 Grounding Step 3 Route power cables. ● Two power sources Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 142 Take a battery string consisting of 40 batteries as an example. A neutral wire is routed from the middle of positive and negative battery strings, each consisting of 20 batteries. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 143 Step 4 Route signal cables. Bind cables to the cabinet. Figure 3-107 Connecting signal cables Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 144: Connecting A Remote Epo Switch

    NC EPO switch. ● Figure 3-109 shows the cable connections for an NO EPO switch. Figure 3-108 Cable connection for an NC EPO switch Figure 3-109 Cable connection for an NO EPO switch Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 145: Connecting Communications Cables

    UPSs and then use screws to tighten the connecting kits to the cabinet according to the following figures: ● Figure 3-110 shows the connection point for the UPS5000-E-200K-SM and UPS5000-E-300K-SM/SMT. ● Figure 3-111 shows the connection point for the UPS5000-E-200K-FM.
  • Page 146 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-110 Installing connecting kits (UPS5000-E-200K-SM and UPS5000- E-300K-SM/SMT) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 147: Connecting Power Cables

    ----End 3.3.2 Connecting Power Cables Context Cable connection for the UPS5000-E-200K-SM is used as an example. The parallel power cables for different UPS models can be connected in a similar way. Procedure Step 1 Ground each UPS in a parallel system separately, and connect power cables and battery cables according to 3.2 Installing a Single...
  • Page 148 (4) Output power cables cables cables Figure 3-114 shows a typical conceptual diagram for a dual-bus system consisting of two UPS systems, and Figure 3-115 show the cable connections for this system. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 149 Figure 3-114 Conceptual diagram of a dual-bus system Figure 3-115 Cable connections for a dual-bus system (1) Mains input power (2) Bypass input power (3) Battery cables (4) Output power cables cables cables ----End Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 150: Connecting Signal Cables

    Figure 3-116 Topology diagram of an N+X parallel system NO TICE Figure 3-117 shows only control modules. Each control module represents a single UPS. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 151 UPSs ● In a dual-bus system, you need to connect cables to BSC ports on the UPSs. Figure 3-118 shows the cable connections for a dual-bus system containing two master systems. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 152: Verifying The Installation

    UPS may be damaged. Table 3-7 Installation checklist Item Acceptance Criteria UPS installation The UPS is securely installed and does not tilt due to vibration. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 153 3. There is no foreign matter around switch terminals. 4. There is no foreign matter on the bottom plate of the cabinet. 5. There is no foreign matter on the rear module subrack. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 154 2. After verifying the installation, reinstall all the covers. 3. Do not remove the dustproof cover before power-on to prevent dust inside the UPS. Figure 3-119 Positions for checking foreign matter (UPS5000-E-200K-FM) (1) Cabinet top (2) Wiring terminal...
  • Page 155 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-120 Positions for checking foreign matter (UPS5000-E-200K-FM, isolation protection) (1) Rear of modules (2) Cabinet top (3) Wiring terminal (4) Switches blocks Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 156 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-121 Positions for checking foreign matter (UPS5000-E-300K-SM) (1) Cabinet top (2) Wiring terminal (3) Cabinet bottom (4) Rear of modules blocks and switch Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 157 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-122 Positions for checking foreign matter (UPS5000-E-300K-SMT, isolation protection) (1) Rear of modules (2) Cabinet top (3) Wiring terminal (4) Switches blocks Figure 3-123 Fill the holes with sealing putty...
  • Page 158 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 3 Installation Figure 3-124 Dustproof cover Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 159: Operations

    Step 2 (Full configuration model) Turn on the UPS bypass input switch, mains input switch, and output switch. After the UPS is powered on, initialization begins. The MDU displays the initialization progress bar. ----End 4.1.2 Initial Startup Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 160: Obtaining Startup Password

    The system displays the Bypass mode and No battery alarms, which do not need to be handled. ----End 4.1.2.2 Settings Wizard Procedure Step 1 Set the language, time and date, network parameters, system parameters, and battery parameters on the Settings Wizard screen. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 161 ● Set Output frequency correctly; otherwise, loads may be affected and the UPS may not work properly. ● Battery parameter settings are critical to battery maintenance, battery lifespan, and UPS discharge time. Figure 4-1 Settings Wizard Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 162: Starting The Inverter

    Starting the Inverter on the LCD Step 1 Choose Common Functions > Inv. ON. NO TE You can also start the inverter by choosing System Info > Maintenance > Inv. ON. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 163 Step 4 Enter the correct user name and password and click Login. Step 5 On the WebUI, choose Monitoring > Control, click Inv. ON, and confirm the operation to start the inverter. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 164: Powering On Loads

    A BCB box is installed. Procedure Step 1 On the System Info > Settings > Dry Contact Set screen, set MUE05A connection to Enable, and set BCB connection [OL] and Battery breaker [STA] to Enable. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 165: Shutting Down And Powering Off The Ups

    After the inverter shuts down, the UPS works in bypass mode if the bypass is normal, as shown in Figure 4-5. The UPS supplies no power and the loads power off if the bypass is abnormal, as shown in Figure 4-6. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 166 Turn off the mains input switch, bypass input switch, and output switch of the UPS. Turn off the upstream mains input and bypass input switches. Step 5 For a UPS in standard configuration, turn off the upstream mains input and bypass input switches. ----End Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 167: Cold-Starting The Ups Using Batteries

    If you shut down the inverter when the bypass input voltage or frequency exceeds the specified threshold, the UPS supplies no power, and the loads are powered off. 4.5 Setting ECO Mode Prerequisites The system is working in inverter mode. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 168 After the inverter starts, the UPS still works in bypass mode and the inverter is on standby. If the bypass is not normal, the inverter supplies power immediately. If the inverter is not started, the UPS may be disconnected. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 169: Testing Batteries

    Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery Maint. Step 2 Tap Start next to Forced Equalized Charging to start a forced equalized charging test. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 170: Shallow Discharge Test

    Step 2 Set Sched. shallow dis. test time and Sched. shallow dis. test interval as required. After the setting is complete, the system will perform an automatic shallow discharge test based on the settings. ----End Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 171: Capacity Test

    ● The UPS generates no battery overtemperature, overvoltage, or overcurrent alarm. No generator is connected to the UPS. ● The mains, batteries, charger, and discharger are normal. No overload alarm is generated. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 172: Lithium Battery Test

    Save the test data obtained from the latest 36 tests. ----End 4.6.2 Lithium Battery Test 4.6.2.1 Shallow Discharge Test Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 173 On the home screen of the UPS LCD, choose System Info > Maintenance > Battery Maint. Tap Start next to Shallow Dis. Test to start a shallow discharge test. Figure 4-12 Starting a shallow discharge test Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 174: Capacity Test

    Step 1 On the home screen of the UPS LCD, choose System Info > Maintenance > Battery Maint. Step 2 Tap Start next to Capacity Test to start a capacity test. Figure 4-13 Starting a capacity test Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 175: Test Data Download

    On the WebUI, choose Query > Logs, choose logs that need to be exported from the Log drop-down list box, and click Query. Figure 4-15 Logs Choose logs that have been queried from the Log drop-down list box, and click Export. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 176: Transferring To Maintenance Bypass Mode

    If the mains is abnormal, the loads may power off. Procedure Step 1 Transfer the UPS to the bypass mode. Step 2 Turn on the maintenance bypass switch as follows. Figure 4-16 Turning on the maintenance bypass switch (UPS5000-E-200K-SM) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 177 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 4 Operations Figure 4-17 Turning on the maintenance bypass switch (UPS5000-E-200K-FM) Figure 4-18 Turning on the maintenance bypass switch (UPS5000-E-200K-FM, isolation protection) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 178 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 4 Operations Figure 4-19 Turning on the maintenance bypass switch (UPS5000-E-300K-SM Figure 4-20 Turning on the maintenance bypass switch (UPS5000-E-300K-SMT) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 179: Transferring From Maintenance Bypass Mode To Normal Mode

    UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) 4 Operations Figure 4-21 Turning on the maintenance bypass switch (UPS5000-E-300K-SMT, isolation protection) NO TE After the system transfers to maintenance bypass mode, the Maint. breaker closed and Bypass mode alarms are displayed on the LCD.
  • Page 180: Performing Epo

    Choose Monitoring > UPS System > Running Control and click Clear Fault. The EPO alarm is cleared. ● On the old WebUI Choose Monitoring > Control > System Commands and Tests and click Clear Faults. The EPO alarm is cleared. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 181: Exporting Data

    Click Export Historical Data and save the displayed webpage. Old Web Choose Query > Historical Alarms, set Severity, Generated, and Cleared, and click Query to query the historical alarm information. Figure 4-24 Querying historical alarms Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 182: Setting Hibernation Mode

    System Settings and set Paral sys hibernate to Enable. Set the module cycle hibernation period to an integer ranging from 1 to 100. The default value is 30. Figure 4-25 Running Parameter Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 183 Set Module cycle hiber. period (d) to an integer ranging from 1 to 100. The default value is 30. Figure 4-26 Running Parameter NO TE Click Submit after setting parameters on the WebUI. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 184: Routine Maintenance

    ● Only maintenance engineers are allowed to maintain power modules and bypass modules. ● Maintain UPSs regularly based on the following requirements. Otherwise, the UPSs may fail to operate properly and the service life may be shortened. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 185: Monthly Maintenance

    Wipe the cabinet surface using Remove the dust, especially a white paper and the paper from the air filter on the front does not turn black. door, or replace the air filter. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 186: Annual Maintenance

    The circuit breakers and ● Replace the circuit of cables and circuit cables meet load breakers. breakers requirements. ● Replace the cables. The actual cable through-current capacity is greater than the circuit breaker specifications. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 187: Battery Maintenance

    5.2.2 Monthly Maintenance Table 5-4 Monthly maintenance Item Expected Result Troubleshooting Battery No battery management Identify the cause of an alarm management alarm is generated. based on the alarm alarm information. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 188 2. Check whether the equalized charging voltage and float charging voltage are correctly set for the UPS. 3. If the fault persists, contact technical support. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 189: Quarterly Maintenance

    UPS is backed up to verify locate the fault (for that the batteries can abnormal alarms, see discharge normally. the alarm list). 2. If the fault persists, contact technical support. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 190: Annual Maintenance

    (A torque wrench is used for checking the torque. After checking that the battery screws meet the requirements, mark the screws for later check.) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 191: Troubleshooting

    EOD voltage and 11.3 V/cell. For details about how to rectify common faults, see Table 6-1. If any unmentioned faults occur, see the alarm list or contact technical support. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 192 The buzzer buzzes, The bypass thyristor Replace the bypass bypass is and the fault is damaged. module. abnormal indicator is on. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 193 Possible Cause Measure The bypass module Reduce the load, or experiences improve ventilation. overtemperature. NO TE For details about component replacement and maintenance involved in Troubleshooting and Alarm List, consult maintenance engineers. Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 194: Technical Specifications

    IP20 (IP21 available IP20 rating if the IP21 component is used) Dimen 2000 mm x 600 mm x 850 mm sions (H x W x D) Comm Dry contacts, RS485, and SNMP unicati Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 195: Internal Switch Specifications

    A/3P A/3P UPS5000- 1000 V E-300K-SM AC/630 A/3P UPS5000- 1000 V E-300K-SMT AC/630 A/3P 7.3 Environmental Specifications Item Specifications Operating temperature 0–40°C Storage temperature –40°C to +70°C Humidity 0%–95% RH (non-condensing) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 196: Safety Regulations And Emc

    ● At 30°C: The UPS works at full load when the voltage is 176–280 V AC and is derated to 40% load when the voltage is 176–80 V AC. Rated frequency 50 Hz/60 Hz Input frequency 40–70 Hz Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 197: Bypass Input Electrical Specifications

    ● The number of positive and negative battery strings must be the same. ● The default number of batteries is 0. Set this parameter based on site requirements. Battery management Intelligent battery management Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 198: Output Electrical Specifications

    (THDv) ● ≤ 4% (100% non-linear load) Output PF Transfer time ● 0 ms (uninterruptible transfer) ● ≤ 20 ms (interruptible transfer) Output voltage unbalance Voltage unbalance: ±3%; phase unbalance: 120±2° Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 199: System Electrical Specifications

    ● Load > 1000%: run for 100 ms 7.9 System Electrical Specifications Item Specifications Redundancy design The auxiliary power supplies, centralized controllers, and parallel signals use redundancy design. ECO in a parallel system Supported Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 200: A (Optional) Tn-C System Application

    If the TN-C system is adopted, short-circuit the input N and PE. NO TE The following cable connections are for reference only. Figure A-1 Connecting the input N and PE (UPS5000-E-200K-SM) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 201 User Manual (50 kVA Power Modules) A (Optional) TN-C System Application Figure A-2 Connecting the input N and PE (UPS5000-E-200K-FM) Figure A-3 Connecting the input N and PE (UPS5000-E-200K-FM, isolation protection) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 202 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) A (Optional) TN-C System Application Figure A-4 Connecting the input N and PE (UPS5000-E-300K-SM) Figure A-5 Connecting the input N and PE (UPS5000-E-300K-SMT) Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 203 UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) A (Optional) TN-C System Application Figure A-6 Connecting the input N and PE (UPS5000-E-300K-SMT, isolation protection) Table A-1 Recommended cross-sectional areas for cables Model Current (A) Recommended Cross- Sectional Area (mm UPS5000-E-200K-SM/FM 335.4...
  • Page 204: B User Interface

    UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) B User Interface User Interface NO TE For details, see the UPS5000-E Monitoring Module User Manual . Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 205: C Alarm List

    UPS5000-E-(50 kVA–300 kVA) User Manual (50 kVA Power Modules) C Alarm List Alarm List NO TE For details about alarms, see the UPS5000 & SmartLi Alarm Reference . Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 206: D Acronyms And Abbreviations

    Acronyms and Abbreviations ASIC application-specific integrated circuit AC transfer switch American wire gauge bus synchronization controller BCB-BOX battery circuit breaker BBB-BOX battery bus bar box control area network Conformite Europeenne digital signal processing Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 207 Ethernet International Electrotechnical Commission liquid crystal display monitor display unit normally closed normally open negative temperature coefficient protective earthing power distribution unit RS485 Recommended Standard Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 208 THDi total distortion of the input current waveform THDv total harmonic distortion of output voltage uninterruptible power system Universal Serial Bus VRLA valve-regulated lead acid battery Issue 15 (2022-01-30) Copyright © Huawei Technologies Co., Ltd.

Table of Contents