3.1.1.3 Installation Clearances

Reserve the following clearances around the cabinet to facilitate operations and
ventilation:
Figure 3-2 Reserved clearances (unit: mm)

3.1.2 Tools

The onsite operation personnel can select tools based on the site requirements.
Issue 17 (2023-07-10)
shorten the battery lifespan and operating temperatures lower than 20°C
reduce the battery backup time.
Reserve at least 800 mm from the front and rear of the cabinet.
Reserve at least 500 mm from the top of the cabinet.
If a top air-flow cabinet is deployed, the UPS can be installed against a wall
and no space needs to be reserved at the rear. If no top air-flow cabinet is
deployed, at least 500 mm space should be reserved at the rear for
ventilation. If the UPS will be operated from the rear, at least 800 mm space
should be reserved for operations.