Download Print this page

Installing Cables - Huawei PDU8000 Quick Manual

Modular precision pdc v2.0
Hide thumbs Also See for PDU8000:

Advertisement

3

Installing Cables

This document uses the dual-input top cable routing and single-input bottom cable routing as
examples. Cable connections for other scenarios are similar.
1. Ensure that all circuit breakers, including upstream output circuit breakers, are switched to
OFF before connecting cables.
2. The PDC ground cable is secured to the equipment room ground bar. The resistance between
the PDC ground cable and the equipment room ground bar is less than 0.1 ohm.
3. The N and PE cables are bound separately from the L1/L2/L3 or L cables for each circuit
breaker. Cables are converged at the beam and bound in groups by cable ties.
Cable Hole Description
Cable holes on the PDC top
Monitoring cable hole
Connecting Cables (Top Cable Routing)
1. Remove the rodent-proof meshes at the top and put them aside.
2. Remove the transparent covers of the N
bar and input copper bar, and put the
covers aside.
Power cable inlet
Power cable outlet
3. Connect cabinet ground cables.
6
Cable holes at the PDC bottom
Cable holes at
the bottom

Advertisement

loading