UPS5000-E-(200 kVA-300 kVA)
User Manual (50 kVA Power Modules)
6.1 UPS Maintenance
Operating Environment Checklist
No.
Check Item
1
Equipment
room
environment
2
Rodent-proof
Issue 17 (2023-07-10)
6
Acceptance Criteria
● The fireproof door of
the equipment room
remains closed, and the
air conditioner works
normally without
interruption.
● The equipment room is
airtight, and the
equipment is not in a
direct ventilation
environment.
● There is no dust or
flammable sundries in
the equipment room.
Rodent-proof measures
are taken in the
equipment room, such as
rat guard and rat trap.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Routine Maintenance
Check Method and
Troubleshooting
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
6 Routine Maintenance
Check
Interval
Monthly
Monthly
195