ABB GOE 2600 Installation And Commissioning Manual page 37

Transformer bushing
Table of Contents

Advertisement

Procedure
1.
Loosen the M8 bolts (24).
2.
Remove the M10 bolts (6), and then remove the
outer terminal (5).
3.
Install the lifting tool (1), refer to Installation of lifting tools, page 20.
1.
Place the lifting tool around the porcelain.
2.
Close the lifting tool.
3.
Install the bolts.
4.
Install the lifting tool (1), the M10 bolts (6) and the
washers (7).
Align the side of the lifting tool with the
oil-level guage (26).
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
Torque
40 ±4 Nm
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lf121085-d1zsc902110-aaa

Table of Contents