Installation; Tools; Consumables - ABB GOE 2600 Installation And Commissioning Manual

Transformer bushing
Table of Contents

Advertisement

4 Installation

4.1 Tools

Tool
Lifting tool
Soft lifting slings
Pull-through cord
Torque wrench key for hex socket
screws, 16 mm (M10) and 13 mm (M8),
torque 20 to 40 Nm.
Wrench for hexagon head screws 45 mm
or adjustable wrench for 45 mm bolts
or larger.
Hydraulic jack
Box spanner

4.2 Consumables

Item
Oil based Vaseline
Mobilgrease 28
Molykote Multilub
Thread-locking fluid
grade 42
Thread-locking activator
grade 47
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
Part number
PDV1909-1,-2,-4
-
9760 669-A
-
-
9769 897-A
9760 669-B
Brand
Hitachi ABB part
number
Fuchs
-
MOBIL
-
Dow Corning
-
-
-
-
-
Note
-
-
With M8 terminal.
For assembly and disassembly of the
draw rod.
-
For the test tap cover.
For removal, and installation of the
draw-rod system.
For removal, and installation of the
draw-rod system.
Note
For treatment of contact surfaces. Does
not react with transformer oil.
Lubricates and protects metals against
corrosion. Protects rubber. Does not
react with transformer oil.
For lubrication of draw-rod threads and
bolts on the outer terminal.
High strength thread-locking fluid,
permanent locking.
Activator for thread-locking fluid
grade 42.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lf121085-d1zsc902110-aaa

Table of Contents