ABB GOE 2600 Installation And Commissioning Manual page 30

Transformer bushing
Table of Contents

Advertisement

2.
Install the winding cables to the bottom contact.
3.
Install the end shield:
1.
Push the end shield carefully against the
pressing ring (17), until the hex screw heads
come through the holes in the end shield.
2.
Turn the end shield approximately 20°, to its
locked position.
4.
Lift the bushing above the opening on the transformer.
End of instruction
30
CAUTION!
Make sure that there is no tension in
the winding cables. Tension in the
winding cables will cause damage to
the draw rod or cables.
Torque
68 ±6 Nm
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lf121085-d1zsc902110-aaa

Table of Contents