2.
Remove the M10 bolts (6), and then remove the
outer terminal (5).
3.
Place the lifting tool, lower part (1) around the
porcelain.
4.
Close the lifting tool (1) and install the bolts.
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
NOTE!
Make sure the rubber protection
protect the bushing.
NOTE!
Align the side of the lifting tool with the
oil-level guage (26).