Installation Manual
Airbridge cBTS3612 CDMA Base Station
 
Connector preparation
Attach labels
Make the corresponding
connection
Engineering drawings
Layout and bind the jumper
Engineering design drawings
Engineering design drawings
Assembly chart
Previous page
Clean up the cabinet interior
Project supervisor/third-party engineer
Install front and rear doors
Project supervisor/third-party engineer
Power cable connection
Project supervisor/third-party engineer
Trunk cable distribution installation
Project supervisor/third-party engineer
Routing the indoor jumper
Project supervisor/third-party engineer
Start outdoor installation
Installing GPS/GLDNASS antenna, jumper and feeder
Project supervisor/third-party engineer
Assembling the antenna
Project supervisor/third-party engineer
Next page
1-3 
Hardware Installation
1 Overview of Installation Process
Verify the position
Routing, binding and
fastening
Check binding process
Introduce trunk cable
from DDF rack
Jumper routing, binding
and labeling
Binding check
Installation plan
Installation check