Acceptance And Handover - Huawei Airbridge cBTS3612 Installation Manual

Cdma base station
Hide thumbs Also See for Airbridge cBTS3612:
Table of Contents

Advertisement

Installation Manual
Airbridge cBTS3612 CDMA Base Station
 
responsibility for the completeness of the equipment, especially the check on the
components that are prone to result in bad electrical contact.
Check the boards and software according to the packing list. Should any problem
occur, please contact the supplier in time.
Caution:
It is recommended that a specific person be assigned for opening each packing box to avoid the case
that a box containing the boards would be discarded, which may bring trouble to the construction. Before
unpacking the next box, check the opened one and make sure that each board box is empty to avoid
any component from being discarded by mistake.

2.7.4 Acceptance and Handover

Upon finishing the acceptance, both parties should sign the Packing List and if there
are any problems during unpacking, both parties should sign the Unpacking Memo.
The equipment is then handed over to the customer. Both sides shall hold one copy
of the memo. The project supervisor should send the memo in time to the goods
keeper at the office in that area for filing the documents.
The equipment should be stored in special rooms and the specific person should be
assigned to take care of the goods. The storeroom should meet the following
requirements: appropriate temperature and humidity, small vibration, low dust
intensity, low electromagnetic interference, protection against rats and insects. If the
damage or loss of the equipment is caused by improper care of the customer, the
responsibility should be taken by the customer.
2-12 
Hardware Installation
2 Installation Preparations

Advertisement

Table of Contents
loading

Table of Contents