Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
Note:
Retain all removed parts for later installation
unless otherwise directed.
Important:
You must acquire 2 screws (5/16–18
TPI 1.75 inches) to complete this installation.
Important:
Cap or plug any disconnected
hydraulic hoses, tubes, or component ports to
prevent contamination entering the system.
Description
No parts required
Connector mount bracket
7-pin connector
Bolt (5/32 inches)
Spacer
Nut (5/32 inches)
Relay and loader arm harness
Plug nut
Grommet
Wire harness retainer
Screw
Self-tapping screw
Relay
Fuse (5 A)
No parts required
No parts required
No parts required
No parts required
No parts required
Qty.
–
Prepare the machine.
1
1
Install the connector and connector
2
mount bracket.
2
2
1
1
Connect the loader arm branch.
1
2
2
Connect the relay and power lead
2
connectors.
1
–
Remove the existing lever.
–
Install the 4-in-1 bucket lever.
–
Install the valve solenoid harness.
–
Test the installation.
–
Complete the installation.
1
Preparing the Machine
No Parts Required
Procedure
1.
Install the bucket; refer to your machine
Operator's Manual for information on installing
and removing the bucket.
Important:
Always use the traction unit to
lift and move the attachment.
Important:
Before installing the bucket,
ensure that the mount plates are free of any
dirt or debris and that the pins rotate freely.
If the pins do not rotate freely, grease them.
6
Use