Note: If you have spare time while you are on-site, please take a moment to update the
part lists with the correct part locations in order to improve the quality of our data.
All the drive data that is collected in 'Drive Data and Software' step should be added to
the table, including the firmware and software version of AC500eco, ACS-AP-S/W,
BCON, CVMI2 and Control hub.
The parameter backup, parameter export and SD card data of BCON should be added
to the table also.
Complete and upload all the information and data described in the steps.
Standard Commissioning Process 91